Past Performance

Government

This turnkey contract for the project awarded to Venergy demonstrates the team’s design, engineering, construction and O&M experience relating to the installation of Solar PV systems in tropical island environments and hurricane winds, as well as, on federal VA facilities. The solar system required a 480V net metered interconnection with the interconnection agreement with Hawaii Electric Co.

Industry Type: 
Government
Project Type: 
Canopy Solar PV Lighting
Project Cost: 
$589,000.00
Project Size: 
78 kW

Retrofit over 7000+ LED bulbs of various types and sizes for six buildings and parking lots totalling over 180,000+ sq/ft of space(excludes parking space size), replacing 47 tons of cooling capacity with new units with better energy efficiency for two building totalling over 29,000+ sq/ft of space, the installation of commercial grade UV lighting for 22 HVAC units, and energy saving smart thermostats for 22 HVAC units that cover 49,000+ sq/ft of space.

Industry Type: 
Government
Project Type: 
Energy Saving/HVAC/Lighting
Project Size: 
ESPC Project Size: Five residential buildings (5 stories each) and one 50,000 sq-ft recreational center

Venergy was selected to take on the task of running 700' of underground electrical utilities from a service transformer to a newly built camp site shower house. Three 700 mcm alumium conductors and a 3/0 copper ground conductor where ran through 4" PVC schedule 40 conduit, and connected with insulated multitap connectors, with 3M detectable buried tape. A new 400 amp service panel was installed replacing the previous aged 200 amp service disconnect.

Industry Type: 
Government
Project Type: 
Electrical

Venergy Group was selected by the Department of Veterans Affairs to restore the Domiciliary at the Lake Nona VA Medical Center in Orlando, FL after it sustained considerable damage from a fire.  Scope of work included the repair of drywall, ceiling tile, flooring, cabinets, appliances, interior lighting fixtures and electrical receptacles.  In addition to the flooring on all four floors, Venergy also remediated smoke damage to walls by cleaning and repainting.  All furniture affected by the fire and subsequent flooding from the fire alarm sprinkler system was replaced along with all applian

Industry Type: 
Government
Project Type: 
Fire Restoration
Project Cost: 
$357,000.00

Venergy Group was selected by the federal government to complete the removal and installation of the roof and all rooftop mechanical equipment at the National Hurricane Center in Miami, FL.  The existing built-up gravel roof was removed completely down to the concrete substrate and a new PVC membrane roof was installed.  Three 60 ton rooftop condensing units were removed from the roof via crane and replaced with new units on engineered, stainless steel curbs.  Evaporator coils, piping and controls were all replaced and recalibrated.  In addition to the roofing and mechanical work, Venergy a

Industry Type: 
Government
Project Cost: 
$1,176,811.00

Venergy provided the Installation of Advanced Metering on Jenson Beach High School in Jensen Beach, FL

Industry Type: 
Government

Venergy installed Power Factor Correction (kVAR) units on 14 pumps and is contracted to install 49 additional units

Industry Type: 
Government

Venergy provided Advanced Metering & Power Factor Correction for Public Service Commission and Advanced Metering Survey for Natural Resources Lab & Crime Lab

Industry Type: 
Government

Venergy supplied 550 Dell computer batteries

Industry Type: 
Government

Army Corps of Engineers - Venergy supplied numerous specialty custom Lighting Fixtures and Bulbs for the United States Army Corps of Engineers' Lake Washington Ship Canal replacement lighting project. These fixtures were selected to replicate the original historic look.  

Army Corps of Engineers- Sacramento Division - Venergy supplied an LED Lighting Retrofit and Installation at Lake Kaweah and Pine Flat

Industry Type: 
Government

Miami Roofing/HVAC - Venergy Group was selected by the federal government to complete the removal and installation of the roof and all rooftop mechanical equipment at the National Hurricane Center in Miami, FL.  The existing built-up gravel roof was removed completely down to the concrete substrate and a new PVC membrane roof was installed.  Three 60 ton rooftop condensing units were removed from the roof via crane and replaced with new units on engineered, stainless steel curbs.  Evaporator coils, piping and controls were all replaced and recalibrated.  In addition to the roofing and mecha

Industry Type: 
Government
Project Type: 
Roofing
Project Cost: 
$1,136,326.00

Venergy was selected to provide this project due to its experience in solar (PV) design and implementation along with experience domestically and abroad. Venergy has been awarded as EPC to design a turnkey Solar Photovoltaic (PV) System Installation at the VA Medical Center (VAMC) at the Community Based Outpatient Clinic (CBOC) Building located at 498 Chalan PalaV) Design, Engineering, Permitting, Project Management, Construction Management, Installation and Commissioning of the solar array.

Industry Type: 
Government
Project Type: 
Solar (PV) Car Canopy
Project Cost: 
$903,284.68
Project Size: 
100 kW System

Venergy performed as sub-contractor and  assisted Alares, LLC (SDVOSB) in conducting Level II ASHRAE Audits for Department of  Veteran Affairs  buildings

Industry Type: 
Government
Project Type: 
Level 2 ASHRAE Energy Audits
Project Size: 
6 Facilities +/- 5,000,000 sq. ft.

Venergy furnished all engineering, design, and placed into service an advanced electrical metering system with future capabilities to add water, natural gas, and steam metering system with future control points to monitor lighting and HVAC. The equipment provided includes: AcquiSuite Data Acquisition Server (DAS); Modhopper wireless 900 MHz encrypted secure transceivers by Obvius to transmit the data; Veris E50C2 power quality meters (Modbus/Bacnet); Custom built Dell energy management computer.

Industry Type: 
Government
Project Type: 
Design/Build/Install Metering System
Project Cost: 
$57,000.00
Project Size: 
14 Buildings Advanced Meters

Venergy redesigned and repaired Energy Management  Control Systems (EMCS) (i.e. Advanced Metering) for 135 buildings ranging from 1,920sq ft. to  287,920sq ft. Redesign and expanded Wifi communications backbone, installation of water and electric meter infrastructure. Integration of all metering and control systems into SCADA   software using both Wonderware and LonWorks including, air quality controls systems, HVAC,  Street lighting, Diesel fuel, back up generators electrical and water meters.

Industry Type: 
Government
Project Type: 
Redesign
Repair
and Expand EMCS
Project Cost: 
$621,000.00
Project Size: 
135 Buildings

Preliminary assessment of buildings  within  contract in order to develop ECMs for the Investment Grade Audit.

Industry Type: 
Government
Project Type: 
Energy Savings Performance Contract
Project Cost: 
$9,500,000.00
Project Size: 
15 Buildings 220,000 sq. ft.

Venergy provided and installed Power  Factor Correction and Voltage Control Guard (VCG) units which will assist the Texas National  Guard to meet their energy reduction goals/mandates. During the measurement and  verification  process of the VCG the Texas Army National Guard realized an 18% reduction in  kW h at the sub-panels where the VCG was connected.  This resulted in  less than an 18  month Return On Investment (ROI). The PFC Unit  completely eliminated  the demand charge  which resulted in $700 per month savings capturing less then an 18 month ROI.

Industry Type: 
Government
Project Type: 
Power Quality Improvement
Project Size: 
5 VCG's & 1 PFC

Texas Army National Guard Camp Swift:  Venergy procured, designed, project  managed, site-supervised, installed and commissioned a solar array in order to provide off-  grid lighting to a canopy for the Texas Army National Guard at Camp Swift Training Site.

Industry Type: 
Government
Project Type: 
Canopy Solar PV Lighting
Project Size: 
.510 kW

USCG Base Petaluma, CA - Venergy provided and installed over 450 Advanced Meters for water, gas and electric as well as Energy Management Control System (EMCS) for 20 commercial buildings and 127 residential units at United States Coast Guard (USCG) Petaluma, CA. Provided project management, engineering, labor, materials and equipment to design, install, test and place into service an advanced electric metering EMCS backbone. Additionally, Venergy furnished Web Hosting services for the USCG to access the meter data for a year following installation to allow real-time access of the data. All of the system designs complied with the Department of Defense’s security and electrical/IT configuration guidelines and regulations.

USCG Sector New England, ME - Venergy delivered 98 various LED lighting products to the USCG Sector Northern New England in South Portland, ME

Industry Type: 
Government
Project Type: 
Installation of Metering System
Project Cost: 
$1,324,845.00
Project Size: 
450 Advanced Meters

Commercial

Venergy Group was selected by the University of Central Florida to retrofit all of their fluorescent lights with LED, energy saving bulbs. Upon completing the required task with amazing success and days before the deadline, Venergy was rewarded with multi buildings based on UCF budget and timing to do the same. The scope of work has ranged from simple LED retrofit and ballast removal, electrical repairs where needed, as well as fluorescent replacement. Currently Venergy has over 7 UCF building awaiting LED retrofit.

Industry Type: 
Commercial
Project Type: 
Lighting

Venergy Group was awarded with the contract for the installation of the methane collection and venting system at the greystar Davie II Apartment Complex. Over time, methane gas can build up under buildings causing a big problem if it came into contact with a spark or flame. Venergy installed a system to collect and vent off this gas so it doesnt become an issue. To accomplish this, the following work was done: installation of 4 in. diameter HDPE perforated pipe, cutting trench of approximately 4 in. width by 4 ft depth at trench locations.

Industry Type: 
Commercial

United States Department of Agriculture - Agricultural Research Service Western Human Nutrition Research Center in Davis, CA.  REPLACE EXISTING POLE AND BOLLARD LIGHT FIXTURES WITH LED LIGHT FIXTURES’.  Installed replacement LED lighting at the USDA Site in Davis, CA

Industry Type: 
Commercial

Venergy installed an AutoTune (Power Factor Correction) device at the main switchgear of the manufacturing plant with sensors and an advanced meter that was then connected to the current Industrial Control System (ICS). Venergy identified and initiated this plant energy reduction project and then designed, installed, and commissioned the project. Following staff training and implementation, this new energy project reduced energy consumption by 6% and eliminated a power factor penalty of 3%. Overall payback for the customer was under 12 months.

Industry Type: 
Commercial

Venergy completed a Power Quality Analysis/ Energy Audit for the UPS facility in New Orleans, LA. Venergy identified and analyzed energy usage for recommendations of energy saving opportunities. Venergy provided a complete report and presentation of findings to UPS management and stakeholders.

Industry Type: 
Commercial

Venergy performed a Preliminary Energy Use Analysis, Level I Walk-Through Analysis and a Level II – Energy Survey & Analysis for the Hyatt hotel. The Hyatt is situated in the cosmopolitan suburb of Rosebank, a modern district north of Johannesburg, South Africa. This energy audit was for future use in obtaining LEED certification.

Industry Type: 
Commercial

Venergy performed a detailed lighting and electrical power quality audit for Heinz, located in Newburyport, Massachusetts. Comprehensive findings were prepared and presented for future use in implementation of Energy Conservation Measures (ECMs).

Industry Type: 
Commercial

Venergy provided a Voltage Control Guard (VCG) for use at Miller Brewing Company. Miller experienced a 19% reduction on their first electricity bill after the installation of Venergy's patented product, the VCG.

Industry Type: 
Commercial

Started in 1956, Jersey Mike’s now has 1,300 restaurants open and under development nationwide.  In just three years, the company has nearly doubled in size.  Venergy Group will provide labor and materials under the scope of work for a new location in Boynton Beach, FL.

Industry Type: 
Commercial
Project Cost: 
$35,000.00

New, free standing construction of Harbor Freight tools store in Jensen Beach, FL

Industry Type: 
Commercial
Project Type: 
HVAC Subcontract
Project Cost: 
$57,500.00