VA Medical Centers VISN 17, TX

Venergy performed as sub-contractor and  assisted Alares, LLC (SDVOSB) in conducting Level II ASHRAE Audits for Department of  Veteran Affairs  buildings

Project Size: 
6 Facilities +/- 5,000,000 sq. ft.
Date: 
2014
Industry Type: 
Government
Project Type: 
Level 2 ASHRAE Energy Audits

Our Mission

To assist each and every client in meeting and exceeding their energy goals by providing a veteran-based, one-stop shop with turn-key energy solutions executed with Honor, Duty and Integrity.


We have a friendly and knowlegable staff happy to take your call:

866-977-7555


 

NOAA

Venergy Group was selected by the federal government to complete the removal and installation of the roof and all rooftop mechanical equipment at the National Hurricane Center in Miami, FL.  The existing built-up gravel roof was removed completely down to the concrete substrate and a new PVC membrane roof was installed.  Three 60 ton rooftop condensing units were removed from the roof via crane and replaced with new units on engineered, stainless steel curbs.  Evaporator coils, piping and controls were all replaced and recalibrated.  In addition to the roofing and mechanical work, Venergy a