VA Medical Center, Agana Heights, Guam

Venergy was selected to provide this project due to its experience in solar (PV) design and implementation along with experience domestically and abroad. Venergy has been awarded as EPC to design a turnkey Solar Photovoltaic (PV) System Installation at the VA Medical Center (VAMC) at the Community Based Outpatient Clinic (CBOC) Building located at 498 Chalan PalaV) Design, Engineering, Permitting, Project Management, Construction Management, Installation and Commissioning of the solar array.

Project Size: 
100 kW System
Project Cost: 
$903,284.68
Date: 
2016
Industry Type: 
Government
Project Type: 
Solar (PV) Car Canopy

Our Mission

To assist each and every client in meeting and exceeding their energy goals by providing a veteran-based, one-stop shop with turn-key energy solutions executed with Honor, Duty and Integrity.


We have a friendly and knowlegable staff happy to take your call:

866-977-7555


 

Everglades National Park

Venergy was selected to take on the task of running 700' of underground electrical utilities from a service transformer to a newly built camp site shower house. Three 700 mcm alumium conductors and a 3/0 copper ground conductor where ran through 4" PVC schedule 40 conduit, and connected with insulated multitap connectors, with 3M detectable buried tape. A new 400 amp service panel was installed replacing the previous aged 200 amp service disconnect.