Venergy installed an AutoTune (Power Factor Correction) device at the main switchgear of the manufacturing plant with sensors and an advanced meter that was then connected to the current Industrial Control System (ICS). Venergy identified and initiated this plant energy reduction project and then designed, installed, and commissioned the project. Following staff training and implementation, this new energy project reduced energy consumption by 6% and eliminated a power factor penalty of 3%. Overall payback for the customer was under 12 months.

Industry Type: 
Commercial

Our Mission

To assist each and every client in meeting and exceeding their energy goals by providing a veteran-based, one-stop shop with turn-key energy solutions executed with Honor, Duty and Integrity.


We have a friendly and knowlegable staff happy to take your call:

866-977-7555


 

Everglades National Park

Venergy was selected to take on the task of running 700' of underground electrical utilities from a service transformer to a newly built camp site shower house. Three 700 mcm alumium conductors and a 3/0 copper ground conductor where ran through 4" PVC schedule 40 conduit, and connected with insulated multitap connectors, with 3M detectable buried tape. A new 400 amp service panel was installed replacing the previous aged 200 amp service disconnect.