Texas Army National Guard Camp Mabry

Venergy provided and installed Power  Factor Correction and Voltage Control Guard (VCG) units which will assist the Texas National  Guard to meet their energy reduction goals/mandates. During the measurement and  verification  process of the VCG the Texas Army National Guard realized an 18% reduction in  kW h at the sub-panels where the VCG was connected.  This resulted in  less than an 18  month Return On Investment (ROI). The PFC Unit  completely eliminated  the demand charge  which resulted in $700 per month savings capturing less then an 18 month ROI.

Project Size: 
5 VCG's & 1 PFC
Date: 
2013
Industry Type: 
Government
Project Type: 
Power Quality Improvement

Our Mission

To assist each and every client in meeting and exceeding their energy goals by providing a veteran-based, one-stop shop with turn-key energy solutions executed with Honor, Duty and Integrity.


We have a friendly and knowlegable staff happy to take your call:

866-977-7555


 

NOAA

Venergy Group was selected by the federal government to complete the removal and installation of the roof and all rooftop mechanical equipment at the National Hurricane Center in Miami, FL.  The existing built-up gravel roof was removed completely down to the concrete substrate and a new PVC membrane roof was installed.  Three 60 ton rooftop condensing units were removed from the roof via crane and replaced with new units on engineered, stainless steel curbs.  Evaporator coils, piping and controls were all replaced and recalibrated.  In addition to the roofing and mechanical work, Venergy a