NOAA

Venergy Group was selected by the federal government to complete the removal and installation of the roof and all rooftop mechanical equipment at the National Hurricane Center in Miami, FL.  The existing built-up gravel roof was removed completely down to the concrete substrate and a new PVC membrane roof was installed.  Three 60 ton rooftop condensing units were removed from the roof via crane and replaced with new units on engineered, stainless steel curbs.  Evaporator coils, piping and controls were all replaced and recalibrated.  In addition to the roofing and mechanical work, Venergy also renovated all existing electrical conduits and cabling on the rooftop, installing new raised, rigid galvanized conduits and providing additional weatherproofing measures to pre-existing antennas and satellites on the rooftop.  Lightning protection system was replaced along with all edge metal and coping.  Parapet walls were resurfaced and waterproofed.

Project Cost: 
$1,176,811.00
Date: 
2016
Industry Type: 
Government

Our Mission

To assist each and every client in meeting and exceeding their energy goals by providing a veteran-based, one-stop shop with turn-key energy solutions executed with Honor, Duty and Integrity.


We have a friendly and knowlegable staff happy to take your call:

866-977-7555


 

Gas Collection, Davie FL

Venergy Group was awarded with the contract for the installation of the methane collection and venting system at the greystar Davie II Apartment Complex. Over time, methane gas can build up under buildings causing a big problem if it came into contact with a spark or flame. Venergy installed a system to collect and vent off this gas so it doesnt become an issue. To accomplish this, the following work was done: installation of 4 in. diameter HDPE perforated pipe, cutting trench of approximately 4 in. width by 4 ft depth at trench locations.