Earth day at Kennedy Space Center

Texas Army National Guard Camp Mabry

Venergy provided and installed Power  Factor Correction and Voltage Control Guard (VCG) units which will assist the Texas National  Guard to meet their energy reduction goals/mandates. During the measurement and  verification  process of the VCG the Texas Army National Guard realized an 18% reduction in  kW h at the sub-panels where the VCG was connected.  This resulted in  less than an 18  month Return On Investment (ROI). The PFC Unit  completely eliminated  the demand charge  which resulted in $700 per month savings capturing less then an 18 month ROI.